Multi-User Abattoir Consultation

 
In this section
http://www.sdt.shetland.org/Introduction.aspxIntroduction

Consultation Documents - Multi-user Abattoir Facility

 

Following the Shetland Development Trust decision to invest up to £2.4 million to develop a new abattoir facility.  It is proposed to site the new abattoir at Staneyhill, Lerwick and the Project Leader, Douglas Irvine is looking for your written comments on the following aspects of the project:

 

  • The proposed location
  • Site plans
  • The equipment required for the facility
  • Operational requirements
  • Other relevant matters

 

Documents showing the site location, site plan and current list of proposed equipment for the site can be viewed by selecting one of the following links:

 

PDF format of site location to view or download (41Kb)
PDF format of site plan to view or download (69Kb)
Excel spreadsheet format of current list of proposed equipment for the site to view or download (49Kb)

 

Please return all comments in writing to the following address by the consultation deadline of Friday 30th March:

Douglas Irvine
Head of Business Development
SIC Economic Development Unit
6 North Ness Business Park
Lerwick
Shetland
ZE1 0LZ

 

Terms Of Use   Privacy Statement © 2005 Designed by Shaw Marketing and Design Ltd  powered by OctEportal™ Register | Login